Building façade using EIP HFW Hidden-Fix Wall panels

What EIP Is Bringing to Big 5 Construct Kenya 2026

Event Preview
Big 5 Construct Kenya 2026

From warehouses and logistics hubs to cold stores and food processing facilities, different projects place different demands on the building envelope.

At Big 5 Construct Kenya 2026, EIP will meet architects, consultants, contractors, developers, manufacturers, and project owners at Stand 1K20 to discuss insulated building systems and the engineering considerations behind selecting the right solution for each application.

For visitors with an active or upcoming project, our team will be available for in-depth technical discussions and consultations. Bring your project requirements, drawings, or early-stage concepts, and we can explore the performance and design requirements the building envelope should address.

Meet EIP at Big 5 Construct Kenya and discuss insulated panel solution requirements

What can you explore with EIP?

EIP’s portfolio supports different building applications, from industrial roofs and architectural façades to internal partitions and temperature-controlled spaces.

01
Roof systems

TRP (Trapezoid Roof Panels)

Insulated roof panel options for industrial and commercial buildings across different profiles, thicknesses, thermal-performance requirements, and project conditions.

02
Architectural walls

HFW (Hidden-Fix Wall Panels)

An external insulated wall panel solution with concealed fixing for projects where envelope performance and a cleaner architectural appearance need to work together.

03
Walls & partitions

TFW (Through-Fix Wall Panels) & SWP (Standard Wall Panels)

Wall and partition options for industrial buildings, internal partitions, low-rise applications, modular buildings, and other project-specific requirements.

04
Temperature controlled

CSP (Cold Store Panels)

CSP is used for walls, ceilings, and partitions in freezer rooms, chiller rooms, cold stores, and other temperature-controlled applications.

HFW (Hidden-Fix Wall Panels)

For projects where the external envelope also contributes to the architectural character of the building, EIP’s HFW provides an external insulated wall panel solution with concealed fixing for a cleaner aesthetic finish. The panels can be installed horizontally or vertically according to the architectural and project requirements.

Building façade using EIP HFW Hidden-Fix Wall Panels

Bring your facility’s requirements

Whether your project is at concept, design, tender, or construction stage, the discussion can begin with what the facility needs its building envelope to achieve.

01
Building application

Warehouse, factory, commercial building, food processing facility, cold store, or another project type.

02
Performance requirement

Thermal performance, internal conditions, fire requirements, environmental exposure, or architectural requirements.

03
Project information

Drawings, specifications, project location, consultant requirements, or the current stage of design and construction.

04
System selection

EIP can then discuss the relevant panel family, thickness, PIR classification, surface specification, and associated detailing.

From specification to site

EIP is more than just a panel manufacturer. With years of technical expertise and engineering knowledge, our team helps connect system specifications with practical solutions carried through to site execution.

01
Engineering & Design

System selection, estimation, shop drawings, BOQ preparation, installation drawings, and technical support.

02
Manufacturing & Supply

A range of panel solutions manufactured and designed for roofs, walls, internal partitions, and temperature-controlled applications.

03
Installation

Site execution through EIP-certified builders in East Africa, supporting continuity between the specified solution and its installation.

What information will make the stand discussion more useful?

If you have a live or upcoming project, bring whatever information is already available. Even an early-stage concept can provide enough context for a more focused technical conversation.

Building use
What is being built and how will it operate?
Project location
Where will the building be constructed?
Internal conditions
Ambient, air-conditioned, chilled, frozen, or another operating requirement.
Thermal requirements
Required U-value or consultant specification, if already defined.
Fire requirements
Any specified classification or project fire-performance criteria.
Drawings or concept
Plans, elevations, preliminary specifications, or project sketches where available.
Industrial buildings
Warehouses & logistics
Manufacturing facilities
Commercial buildings
Architectural façades
Food processing facilities
Cold stores
Extensions & upgrades
Big 5 Construct Kenya 2026

Meet EIP at Stand 1K20

Visit the EIP team in Nairobi to explore insulated building solutions and discuss upcoming industrial, commercial, architectural, and temperature-controlled projects.

Date
21-23 October 2026
Venue
Sarit Expo Centre
Location
Nairobi, Kenya
Stand
1K20
Planning to attend?

Register for Big 5 Construct Kenya and visit EIP at Stand 1K20.


Register to Visit


Discuss a Project with EIP